Energy storage in the United Arab Emirates

Energy storage in the United Arab Emirates

Current regulatory developments

Updated September 2026

Current Regulations Icon

DEWA Phase 7: 2,000 MW PV + 8,400 MWh BESS (global top-3 single site)

Current Regulations Icon

EWEC 400 MW greenfield BESS procurement

Current Regulations Icon

Hatta 250 MW/1,500 MWh PHES operational (first GCC)

Current Regulations Icon

Net Zero 2050 / 14.2 GW renewable target by 2030

Five things to know about BESS in the UAE.

No specific regulatory framework or classification for batteries exists, though the market is evolving at pace. In the absence of specific regulations relating to the battery sector, there is no regulatory classification of batteries and no special licenses required to operate a battery. A battery storage project company would need to obtain the same licenses as applicable to a company engaged in the business of electricity generation.

Graph Icon

Revenue will derive from optimization-based stacking, though the market structure differs from liberalized European models. Battery storage revenues are anticipated to derive from a combination (or "stack") of revenue streams, typically managed via an optimization agreement with an energy aggregator/offtaker. However, given the predominance of government-owned utilities (DEWA, EWEC), procurement-based models dominate.

Battery Icon

The UAE's pipeline has transformed from nascent to globally significant. Masdar and EWEC is developing the world’s largest solar-plus-storage project, combining 5.2GW of solar power with 19GWh of battery storage to provide 1GW of 24/7 clean energy. The 250 MW/1,500 MWh Hatta pumped hydro storage project commenced operations in 2025 as the first PHES in the GCC. The UAE has over 25 GWh of planned or announced projects through 2027.

Temperature Icon

Extreme temperatures pose specific technology and performance risks. Temperatures regularly exceeding 45°C in summer create concerns about lithium-ion battery performance degradation and fire risk, requiring careful technology selection and thermal management design.

No financial or regulatory incentives are currently available for battery storage. There are currently no financial or regulatory incentives available for battery storage plants. However, the lack of regulatory framework may evolve as the market grows and the UAE targets 14.2 GW of installed renewables by 2030.

Green Fractal Background
“Eversheds Sutherland's strengths are its deep experience in the sector, good level of due diligence and the quality of deliverables.” Chambers Middle East

Explore other key BESS markets


UK

Germany

Netherlands

Ireland

Finland

Hungary

Italy

Poland

Portugal

Romania

Spain

Sweden

US

Chile

UAE

China

© Eversheds Sutherland. All rights reserved. Eversheds Sutherland is a global provider of legal and other services operating through various separate and distinct legal entities. Eversheds Sutherland is the name and brand under which the members of Eversheds Sutherland Limited (Eversheds Sutherland (International) LLP and Eversheds Sutherland (US) LLP) and their respective controlled, managed and affiliated firms and the members of Eversheds Sutherland (Europe) Limited (each an "Eversheds Sutherland Entity" and together the "Eversheds Sutherland Entities") provide legal or other services to clients around the world. Eversheds Sutherland Entities are constituted and regulated in accordance with relevant local regulatory and legal requirements and operate in accordance with their locally registered names. The use of the name Eversheds Sutherland, is for description purposes only and does not imply that the Eversheds Sutherland Entities are in a partnership or are part of a global LLP. The responsibility for the provision of services to the client is defined in the terms of engagement between the instructed firm and the client.

Connect with us

linkedin logo
facebook icon
youtube icon